Saturday, October 4, 2008

New Driveway


This where the first truck to arrive came to a grinding halt with a broken drive shaft. All 5 cubic metres of concrete had to be unloaded and wasted before it could be moved. They sent an excavator later in the afternoon to clear up the mess.
Unloading the second truck load, well third really I suppose.
Finished concreting.
Finished driveway with the bricks joined up to the new concrete surface.

No comments: